Hourly Picovale meter flow with the total order, the AKT and Bear River orders, Bear River's reported actual (from pump reports), and the implied AKT use (meter − Bear River actual; overflow not subtracted, so an upper bound) — all left axis in cfs — plotted against the North Ditch gate setting (right axis, inches), Aug 25 – Aug 31. Bear River actual and implied-AKT lines break where no pump report exists:
| Date | Time | Gate (in) | Change | Set by |
|---|---|---|---|---|
| 2026-08-26 | 05:10 | 13.5 | Raised from 12.2″ current | Henry |
| 2026-08-25 | 05:15 | 12.2 | Raised from -2″ | Henry |
| 2026-08-21 | 05:19 | -2 | Lowered from 10.5″ | Henry |
| 2026-08-19 | 08:40 | 10.5 | Lowered from 12.4″ | Henry |
| 2026-08-17 | 05:00 | 12.4 | Raised from 8.4″ | Henry |
| Source | CFS | Effective start | Effective end | Notes |
|---|---|---|---|---|
| Bear River | 9 | 2026-08-25 07:00 | ongoing | Stands until changed |
| AKT | 19 | 2026-08-26 07:00 | ongoing | Stands until changed |
Current standing orders total 28 cfs. Orders are due 24 h ahead of a 7am delivery.
At an unchanged 13.5″ gate, flow is holding near 25.2 cfs (24-h average), running about 2.8 cfs under the 28 cfs order. Selected hourly readings (full series in master.csv):
| Date | Time | cfs | Diverted (AF) | Note |
|---|---|---|---|---|
| 2026-08-31 | 02:00 | 24.50 | 2.025 | |
| 2026-08-31 | 03:00 | 22.40 | 1.851 | |
| 2026-08-31 | 04:00 | 23.10 | 1.909 | |
| 2026-08-31 | 05:00 | 25.20 | 2.083 | |
| 2026-08-31 | 06:00 | 27.30 | 2.256 | |
| 2026-08-31 | 07:00 | 28.00 | 2.314 | Latest latest |
Prior full day (8/30) diverted 50.2 AF over 24 hours.
The gate is at 13.5″ (set 8/26). Recent daily-average flow: 26.5 (8/27), 26.0 (8/28), 25.7 (8/29), 25.3 (8/30), 25.1 (8/31). The 24-h mean is 25.2 cfs with scatter min 22.4, max 28.0, SD 1.4 — supply is running about 2.8 cfs under the 28 cfs order.