Hourly Picovale meter flow with the total order, the AKT and Bear River orders, Bear River's reported actual (from pump reports), and the implied AKT use (meter − Bear River actual; overflow not subtracted, so an upper bound) — all left axis in cfs — plotted against the North Ditch gate setting (right axis, inches), Aug 19 – Aug 25. Bear River actual and implied-AKT lines break where no pump report exists:
| Date | Time | Gate (in) | Change | Set by |
|---|---|---|---|---|
| 2026-08-25 | 05:15 | 12.2 | Raised from -2″ current | Henry |
| 2026-08-21 | 05:19 | -2 | Lowered from 10.5″ | Henry |
| 2026-08-19 | 08:40 | 10.5 | Lowered from 12.4″ | Henry |
| 2026-08-17 | 05:00 | 12.4 | Raised from 8.4″ | Henry |
| 2026-08-14 | 11:25 | 8.4 | Lowered from 8.75″ | Henry |
| Source | CFS | Effective start | Effective end | Notes |
|---|---|---|---|---|
| AKT | 16 | 2026-08-25 07:00 | ongoing | Stands until changed |
| Bear River | 9 | 2026-08-25 07:00 | ongoing | Stands until changed |
Current standing orders total 25 cfs. Orders are due 24 h ahead of a 7am delivery.
At an unchanged 12.2″ gate, flow is holding near 0.8 cfs (24-h average), running about 24.2 cfs under the 25 cfs order. Selected hourly readings (full series in master.csv):
| Date | Time | cfs | Diverted (AF) | Note |
|---|---|---|---|---|
| 2026-08-25 | 02:00 | 0.00 | 0.000 | |
| 2026-08-25 | 03:00 | 0.00 | 0.000 | |
| 2026-08-25 | 04:00 | 0.00 | 0.000 | |
| 2026-08-25 | 05:00 | 0.00 | 0.000 | |
| 2026-08-25 | 06:00 | 0.00 | 0.000 | |
| 2026-08-25 | 07:00 | 19.80 | 1.636 | Latest latest |
Prior full day (8/24) diverted 0.0 AF over 24 hours.
The gate is at 12.2″ (set 8/25). Recent daily-average flow: 7.3 (8/21), 0.0 (8/22), 0.0 (8/23), 0.0 (8/24), 2.5 (8/25). The 24-h mean is 0.8 cfs with scatter min 0.0, max 19.8, SD 4.0 — supply is running about 24.2 cfs under the 25 cfs order.