Hourly Picovale meter flow with the total order, the AKT and Bear River orders, Bear River's reported actual (from pump reports), and the implied AKT use (meter − Bear River actual; overflow not subtracted, so an upper bound) — all left axis in cfs — plotted against the North Ditch gate setting (right axis, inches), Aug 15 – Aug 21. Bear River actual and implied-AKT lines break where no pump report exists:
| Date | Time | Gate (in) | Change | Set by |
|---|---|---|---|---|
| 2026-08-21 | 05:19 | -2 | Lowered from 10.5″ current | Henry |
| 2026-08-19 | 08:40 | 10.5 | Lowered from 12.4″ | Henry |
| 2026-08-17 | 05:00 | 12.4 | Raised from 8.4″ | Henry |
| 2026-08-14 | 11:25 | 8.4 | Lowered from 8.75″ | Henry |
| 2026-08-13 | 05:10 | 8.75 | Lowered from 10″ | Henry |
| Source | CFS | Effective start | Effective end | Notes |
|---|---|---|---|---|
| AKT | 0 | 2026-08-21 07:00 | ongoing | Stands until changed |
| AKT | 0 | 2026-08-21 07:00 | ongoing | Stands until changed |
Current standing orders total 0 cfs. Orders are due 24 h ahead of a 7am delivery.
At an unchanged -2″ gate, flow is holding near 22.8 cfs (24-h average), running about 22.8 cfs over the 0 cfs order. Selected hourly readings (full series in master.csv):
| Date | Time | cfs | Diverted (AF) | Note |
|---|---|---|---|---|
| 2026-08-21 | 02:00 | 23.10 | 1.909 | |
| 2026-08-21 | 03:00 | 24.80 | 2.050 | |
| 2026-08-21 | 04:00 | 24.80 | 2.050 | |
| 2026-08-21 | 05:00 | 24.80 | 2.050 | |
| 2026-08-21 | 06:00 | 13.70 | 1.132 | |
| 2026-08-21 | 07:00 | 4.11 | 0.340 | Latest latest |
Prior full day (8/20) diverted 47.8 AF over 24 hours.
The gate is at -2″ (set 8/21). Recent daily-average flow: 24.9 (8/17), 28.8 (8/18), 26.1 (8/19), 24.1 (8/20), 20.3 (8/21). The 24-h mean is 22.8 cfs with scatter min 4.1, max 25.5, SD 4.5 — supply is running about 22.8 cfs over the 0 cfs order.