Hourly Picovale meter flow with the total order, the AKT and Bear River orders, Bear River's reported actual (from pump reports), and the implied AKT use (meter − Bear River actual; overflow not subtracted, so an upper bound) — all left axis in cfs — plotted against the North Ditch gate setting (right axis, inches), Aug 8 – Aug 14. Bear River actual and implied-AKT lines break where no pump report exists:
| Date | Time | Gate (in) | Change | Set by |
|---|---|---|---|---|
| 2026-08-14 | 11:25 | 8.4 | Lowered from 8.75″ current | Henry |
| 2026-08-13 | 05:10 | 8.75 | Lowered from 10″ | Henry |
| 2026-08-12 | 09:40 | 10 | Raised from 9.5″ | Ben |
| 2026-08-07 | 09:50 | 9.5 | Lowered from 10″ | Henry |
| 2026-08-06 | 12:50 | 10 | Lowered from 10.5″ | Henry |
| Source | CFS | Effective start | Effective end | Notes |
|---|---|---|---|---|
| Bear River | 5 | 2026-08-05 07:00 | ongoing | Stands until changed |
| AKT | 8 | 2026-08-13 07:00 | ongoing | Stands until changed |
Current standing orders total 13 cfs. Orders are due 24 h ahead of a 7am delivery.
At an unchanged 8.4″ gate, flow is holding near 17.5 cfs (24-h average), running about 4.5 cfs over the 13 cfs order. Selected hourly readings (full series in master.csv):
| Date | Time | cfs | Diverted (AF) | Note |
|---|---|---|---|---|
| 2026-08-14 | 08:00 | 18.30 | 1.512 | |
| 2026-08-14 | 09:00 | 16.90 | 1.397 | |
| 2026-08-14 | 10:00 | 17.60 | 1.455 | |
| 2026-08-14 | 11:00 | 18.30 | 1.512 | |
| 2026-08-14 | 12:00 | 15.90 | 1.314 | |
| 2026-08-14 | 13:00 | 16.90 | 1.397 | Latest latest |
Prior full day (8/13) diverted 38.2 AF over 24 hours.
The gate is at 8.4″ (set 8/14). Recent daily-average flow: 21.0 (8/10), 20.6 (8/11), 22.0 (8/12), 19.3 (8/13), 17.6 (8/14). The 24-h mean is 17.5 cfs with scatter min 15.9, max 18.7, SD 0.6 — supply is running about 4.5 cfs over the 13 cfs order.