Hourly Picovale meter flow with the total order, the AKT and Bear River orders, Bear River's reported actual (from pump reports), and the implied AKT use (meter − Bear River actual; overflow not subtracted, so an upper bound) — all left axis in cfs — plotted against the North Ditch gate setting (right axis, inches), Aug 6 – Aug 12. Bear River actual and implied-AKT lines break where no pump report exists:
| Date | Time | Gate (in) | Change | Set by |
|---|---|---|---|---|
| 2026-08-12 | 09:40 | 10 | Raised from 9.5″ current | Ben |
| 2026-08-07 | 09:50 | 9.5 | Lowered from 10″ | Henry |
| 2026-08-06 | 12:50 | 10 | Lowered from 10.5″ | Henry |
| 2026-08-05 | 07:20 | 10.5 | Raised from 9″ | Henry |
| 2026-08-04 | 05:20 | 9 | Raised from 7.4″ | Henry |
| Source | CFS | Effective start | Effective end | Notes |
|---|---|---|---|---|
| Bear River | 5 | 2026-08-05 07:00 | ongoing | Stands until changed |
| AKT | 18 | 2026-08-12 09:40 | ongoing | Stands until changed |
Current standing orders total 23 cfs. Orders are due 24 h ahead of a 7am delivery.
At an unchanged 10″ gate, flow is holding near 20.6 cfs (24-h average), running about 2.4 cfs under the 23 cfs order. Selected hourly readings (full series in master.csv):
| Date | Time | cfs | Diverted (AF) | Note |
|---|---|---|---|---|
| 2026-08-12 | 09:00 | 19.50 | 1.612 | |
| 2026-08-12 | 10:00 | 20.20 | 1.669 | |
| 2026-08-12 | 11:00 | 22.40 | 1.851 | |
| 2026-08-12 | 12:00 | 24.50 | 2.025 | |
| 2026-08-12 | 13:00 | 24.10 | 1.992 | |
| 2026-08-12 | 14:00 | 23.40 | 1.934 | Latest latest |
Prior full day (8/11) diverted 40.9 AF over 24 hours.
The gate is at 10″ (set 8/12). Recent daily-average flow: 21.7 (8/8), 21.5 (8/9), 21.0 (8/10), 20.6 (8/11), 20.8 (8/12). The 24-h mean is 20.6 cfs with scatter min 19.1, max 24.5, SD 1.5 — supply is running about 2.4 cfs under the 23 cfs order.