Hourly Picovale meter flow with the total order, the AKT and Bear River orders, Bear River's reported actual (from pump reports), and the implied AKT use (meter − Bear River actual; overflow not subtracted, so an upper bound) — all left axis in cfs — plotted against the North Ditch gate setting (right axis, inches), Jul 31 – Aug 6. Bear River actual and implied-AKT lines break where no pump report exists:
| Date | Time | Gate (in) | Change | Set by |
|---|---|---|---|---|
| 2026-08-06 | 12:50 | 10 | Lowered from 10.5″ current | Henry |
| 2026-08-05 | 07:20 | 10.5 | Raised from 9″ | Henry |
| 2026-08-04 | 05:20 | 9 | Raised from 7.4″ | Henry |
| 2026-07-31 | 14:32 | 7.4 | Raised from 6.5″ | Henry |
| 2026-07-31 | 09:00 | 6.5 | Lowered from 9.5″ | Henry |
| Source | CFS | Effective start | Effective end | Notes |
|---|---|---|---|---|
| AKT | 15 | 2026-08-04 07:00 | ongoing | Stands until changed |
| Bear River | 5 | 2026-08-05 07:00 | ongoing | Stands until changed |
Current standing orders total 20 cfs. Orders are due 24 h ahead of a 7am delivery.
At an unchanged 10″ gate, flow is holding near 25.9 cfs (24-h average), running about 5.9 cfs over the 20 cfs order. Selected hourly readings (full series in master.csv):
| Date | Time | cfs | Diverted (AF) | Note |
|---|---|---|---|---|
| 2026-08-06 | 03:00 | 25.90 | 2.140 | |
| 2026-08-06 | 04:00 | 25.90 | 2.140 | |
| 2026-08-06 | 05:00 | 26.90 | 2.223 | |
| 2026-08-06 | 06:00 | 26.20 | 2.165 | |
| 2026-08-06 | 07:00 | 25.50 | 2.107 | |
| 2026-08-06 | 08:00 | 26.90 | 2.223 | Latest latest |
Prior full day (8/5) diverted 46.8 AF over 24 hours.
The gate is at 10″ (set 8/6). Recent daily-average flow: 11.3 (8/2), 11.2 (8/3), 17.0 (8/4), 23.6 (8/5), 26.0 (8/6). The 24-h mean is 25.9 cfs with scatter min 25.2, max 27.3, SD 0.6 — supply is running about 5.9 cfs over the 20 cfs order.