Hourly Picovale meter flow with the total order, the AKT and Bear River orders, Bear River's reported actual (from pump reports), and the implied AKT use (meter − Bear River actual; overflow not subtracted, so an upper bound) — all left axis in cfs — plotted against the North Ditch gate setting (right axis, inches), Jul 25 – Jul 31. Bear River actual and implied-AKT lines break where no pump report exists:
| Date | Time | Gate (in) | Change | Set by |
|---|---|---|---|---|
| 2026-07-31 | 09:00 | 6.5 | Lowered from 12.5″ current | Henry |
| 2026-07-23 | 11:00 | 12.5 | Raised from 11.4″ | Ben |
| 2026-07-23 | 06:15 | 11.4 | Raised from 11″ | Henry |
| 2026-07-21 | 05:30 | 11 | Raised from 10.5″ | Henry |
| 2026-06-24 | 05:18 | 10.5 | Raised from 8.5″ | Henry |
| Source | CFS | Effective start | Effective end | Notes |
|---|---|---|---|---|
| AKT | 8 | 2026-07-31 07:00 | ongoing | Stands until changed |
| Bear River | 0 | 2026-07-31 07:00 | ongoing | Stands until changed |
Current standing orders total 8 cfs. Orders are due 24 h ahead of a 7am delivery.
At an unchanged 6.5″ gate, flow is holding near 27.1 cfs (24-h average), running about 19.1 cfs over the 8 cfs order. Selected hourly readings (full series in master.csv):
| Date | Time | cfs | Diverted (AF) | Note |
|---|---|---|---|---|
| 2026-07-31 | 05:00 | 30.00 | 2.479 | |
| 2026-07-31 | 06:00 | 27.30 | 2.256 | |
| 2026-07-31 | 07:00 | 24.80 | 2.050 | |
| 2026-07-31 | 08:00 | 22.40 | 1.851 | |
| 2026-07-31 | 09:00 | 22.00 | 1.818 | |
| 2026-07-31 | 10:00 | 14.00 | 1.157 | Latest latest |
Prior full day (7/30) diverted 56.4 AF over 24 hours.
The gate is at 6.5″ (set 7/31). Recent daily-average flow: 27.0 (7/27), 28.0 (7/28), 27.8 (7/29), 28.4 (7/30), 25.8 (7/31). The 24-h mean is 27.1 cfs with scatter min 14.0, max 30.8, SD 3.4 — supply is running about 19.1 cfs over the 8 cfs order.