Hourly Picovale meter flow with the total order, the AKT and Bear River orders, Bear River's reported actual (from pump reports), and the implied AKT use (meter − Bear River actual; overflow not subtracted, so an upper bound) — all left axis in cfs — plotted against the North Ditch gate setting (right axis, inches), Jul 24 – Jul 30. Bear River actual and implied-AKT lines break where no pump report exists:
| Date | Time | Gate (in) | Change | Set by |
|---|---|---|---|---|
| 2026-07-23 | 11:00 | 12.5 | Raised from 11.4″ current | Ben |
| 2026-07-23 | 06:15 | 11.4 | Raised from 11″ | Henry |
| 2026-07-21 | 05:30 | 11 | Raised from 10.5″ | Henry |
| 2026-06-24 | 05:18 | 10.5 | Raised from 8.5″ | Henry |
| 2026-06-22 | 09:35 | 8.5 | Raised from 8.1″ | Henry |
| Source | CFS | Effective start | Effective end | Notes |
|---|---|---|---|---|
| Bear River | 8 | 2026-07-21 07:00 | 2026-07-31 07:00 | Stands until changed |
| AKT | 18 | 2026-07-21 07:00 | 2026-07-31 07:00 | Stands until changed |
Current standing orders total 26 cfs. Orders are due 24 h ahead of a 7am delivery.
At an unchanged 12.5″ gate, flow is holding near 28.0 cfs (24-h average), running about 2.0 cfs over the 26 cfs order. Selected hourly readings (full series in master.csv):
| Date | Time | cfs | Diverted (AF) | Note |
|---|---|---|---|---|
| 2026-07-30 | 03:00 | 26.90 | 2.223 | |
| 2026-07-30 | 04:00 | 28.00 | 2.314 | |
| 2026-07-30 | 05:00 | 29.20 | 2.413 | |
| 2026-07-30 | 06:00 | 28.80 | 2.380 | |
| 2026-07-30 | 07:00 | 30.40 | 2.512 | |
| 2026-07-30 | 08:00 | 29.20 | 2.413 | Latest latest |
Prior full day (7/29) diverted 55.2 AF over 24 hours.
The gate is at 12.5″ (set 7/23). Recent daily-average flow: 27.1 (7/26), 27.0 (7/27), 28.0 (7/28), 27.8 (7/29), 28.6 (7/30). The 24-h mean is 28.0 cfs with scatter min 25.5, max 30.4, SD 1.1 — supply is running about 2.0 cfs over the 26 cfs order.